
Reliable Power
Commercial Switchgear Replacement: Modernizing Your Electrical Foundation for Safety & Reliability
Modernize Power specializes in replacing old, outdated commercial electrical switchgear across California, ensuring your facility's power distribution meets modern safety standards, regulatory compliance, and stringent insurance requirements for uninterrupted operations.
Consultation
Project Management
Design & Engineering
Service & Maintenance
Turnkey Installation
Enhanced Safety:
Replace hazardous, outdated components to prevent electrical fires, shocks, and arc flash incidents.
Guaranteed Reliability:
Improve power distribution stability, reduce unexpected outages, and ensure consistent operation.
Insurance Compliance:
Meet modern electrical code and safety standards to avoid policy exclusions and secure favorable rates.
Increased Capacity & Efficiency:
Support modern electrical loads and improve overall energy distribution within your facility.
Future-Ready Infrastructure:
Invest in a foundational upgrade that prepares your facility for future technology and growth.
What is Commercial Switchgear and Why is Replacement Crucial?
Commercial electrical switchgear serves as the central control and protection hub for your facility's entire electrical system. Often referred to as the "electrical meter mains" or a sophisticated form of a circuit breaker panel, it houses essential components like circuit breakers, switches, fuses, and control panels. Its primary functions are to:
1. Distribute Power: Safely direct electricity from your utility service to various circuits and equipment throughout your building.
2. Protect Equipment & Personnel: Automatically isolate faulty circuits during overloads or short circuits, preventing damage to downstream equipment and protecting occupants from electrical hazards.
3. Isolate Circuits for Maintenance: Allow sections of the electrical system to be de-energized safely for repairs or upgrades without shutting down the entire facility.
Why is replacement often crucial? Many commercial buildings in California operate with outdated switchgear that no longer meets modern safety standards or the demands of today's technology.
Old switchgear is a significant concern for insurance companies due to its increased risk of electrical fires, system failures, and liability concerns. These aging systems can have deteriorated components (e.g., circuit breakers that fail to trip), inadequate insulation, and designs that predate modern electrical codes and safety protocols.
Replacing this outdated infrastructure is not just an upgrade; it's a vital investment in the safety, reliability, and compliance of your entire operation.

why Backup power?
Why Upgrading Outdated Switchgear is Non-Negotiable: Safety, Compliance & Financial Protection
Operating with old or obsolete switchgear is a ticking time bomb for many commercial and industrial facilities. The risks extend far beyond mere inconvenience:
Many older switchgear components, particularly certain types of circuit breakers (e.g., Federal Pacific, Zinsco), are notorious for failing to trip during overloads or short circuits. This allows excessive current to flow, leading to overheating, arcing, and severe fire hazards, often mandated for replacement by insurance carriers.
Insurance companies are increasingly wary of properties with outdated electrical panels and switchgear. They may refuse to cover properties, impose significantly higher premiums, or exclude coverage for electrical fire damage if an obsolete system is present, deeming it a major liability.
Older switchgear was simply not designed to handle the high electrical demands of today's technology, advanced machinery, and sensitive electronics. This leads to frequent overloads, tripped breakers, and potential damage to connected equipment.
Aging components are more prone to failure, leading to more frequent, costly emergency repairs and unplanned power outages that disrupt operations and impact profitability.
Older designs often lack modern arc-flash protection, posing extreme danger to personnel working on or near the energized equipment.
Modernize Power's switchgear replacement services directly address these critical risks, ensuring your facility is safe, compliant, and poised for reliable power distribution.
SPECIALIZED BUILDER
Our Comprehensive Switchgear Replacement Process: Engineered for Modern Demands
As a C-10 Electrical and B-General Contractor, with 10 years of specialized experience, Modernize Power provides a seamless and compliant switchgear upgrade:
01
Thorough Electrical System Assessment:
-
Detailed Inspection: Our licensed electricians conduct an in-depth evaluation of your existing switchgear, electrical panels, and overall distribution system.
-
Load Analysis: We assess your current and future electrical demands to ensure the new switchgear is perfectly sized for optimal performance and scalability.
-
Code & Compliance Review: Meticulous review against current NEC, California Electrical Code, and specific industry regulations (e.g., HCAI for healthcare facilities).
02
Custom Design & Engineering:
-
Modern Solution Design: Our engineers design a custom replacement solution that enhances safety, reliability, and efficiency. This includes selecting the appropriate voltage, amperage, and protective devices.
-
Seamless Integration: Designs ensure the new switchgear integrates flawlessly with existing conduits, cabling, and your facility's unique layout, minimizing modifications.
-
Advanced Features: Incorporating modern features like improved grounding, integrated surge protection, and Arc Fault Circuit Interrupters (AFCIs) for enhanced safety.
03
Permitting & Insurance Coordination:
-
Full Permit Management: We handle all necessary permits and approvals with local building departments and utility providers in California.
-
Insurance Liaison: We provide documentation and expertise to assist with your insurance company's requirements for outdated electrical system replacement.
04
Professional Installation & Project Management:
-
Minimized Downtime: Our project managers meticulously plan the replacement to minimize operational disruption, often utilizing off-hours or phased installations.
-
Precise Removal & Installation: Expert removal of old, outdated switchgear and professional installation of the new, modern system by C-10 licensed electricians.
-
Quality Assurance: All work adheres to the highest safety standards and is backed by our comprehensive licenses, ensuring durability and peak performance.
Safety Standards (Arc Flash):
Modern switchgear significantly reduces arc flash hazards. Your upgrade should prioritize enhanced arc-flash protection for personnel safety.
Harmonic Distortion:
For facilities with large variable frequency drives or sensitive electronics, the new switchgear must be designed to mitigate harmonic distortion to maintain power quality.
Utility Coordination:
Careful coordination with your utility provider is essential for planned outages required during replacement, minimizing disruption.
Integration with Backup Power:
If you have existing generators or other backup systems, the new switchgear must seamlessly integrate to maintain automatic power transfer and overall resilience.
Scalability for Future Needs:
Design considerations for future load additions (e.g., EV charging, new machinery) to avoid costly upgrades down the line.
FAQs
We Have Answers, For Your Questions!
Insurance companies view outdated switchgear as a significant fire and safety hazard due to potential failures (e.g., circuit breakers not tripping) and non-compliance with modern electrical codes. Replacing it reduces their liability, leading to better coverage or more favorable premiums for you.
A standby generator automatically detects a power outage and restores electricity within seconds. This ensures critical medical equipment, life support systems, lighting, HVAC, and communication networks remain operational, directly safeguarding resident health and comfort.
Key risks include increased chances of electrical fires, equipment damage from overloads, unexpected power outages and downtime, non-compliance with current safety codes, and potential denial of insurance claims related to electrical failures.
The duration varies based on the size and complexity of your existing system and the new installation. Modernize Power meticulously plans the process to minimize downtime, often scheduling work during off-peak hours or in phases, with typical projects lasting from a few days to several weeks (not including design, engineering, and the permitting process).
A temporary power shutdown is usually required for safe replacement. Our project managers work closely with you to plan the outage during the least disruptive time, often overnight or weekends, and can coordinate temporary power solutions if absolutely necessary to maintain critical operations.
Yes, as a licensed B-General Contractor and C-10 Electrical Contractor, we manage the entire permitting and inspection process, ensuring your switchgear replacement complies with all local, state (including California Electrical Code), and specific industry regulations.
Yes. Modern switchgear designs offer improved efficiency in power distribution and are built to handle today's higher electrical loads. They can also integrate with building management systems, renewable energy sources, and support new technologies like EV charging stations.
Yes. Modernize Power partners with providers offering flexible financing, including C-PACE (Commercial Property Assessed Clean Energy) for commercial properties. This allows you to fund essential switchgear upgrades with no upfront capital, repaid through a property tax assessment.

Contact us
Get in Touch!
Contact us, we're here to help.
Our Hours
Mon - Fri
8am - 6pm
Saturday
Closed
Sunday
Closed


